PUPIL TRAIL-GUIDE PROJECT RECORD — original editable aid Not a verified route, navigation map, actual class trial or visit approval. Intended reader, product and scope: Proposed start, alignment and return: Evidence source/observation and date for each claim: Surface, barriers, facilities, distance and time: Unknowns or conflicting evidence: Relevant Code/site advice and current changes: Concept-map label or real-map verification required: First draft claims and evidence behind them: Reviewer questions: Revised reader-facing wording: Adult site/visit tasks kept separate: Sharing arrangements and private information to remove: Version/date; conditions that require revision: FILLED FICTIONAL REVISION First draft: Easy loop, open toilets, quick return, suitable for everyone. Evidence: proposed start, concept sketch, old description only. No current gate, facility, distance or availability evidence. Revision: Proposed class-project loop. Alignment is conceptual. Gate, surface, facilities, distance and availability need checking before real use. Next: identify the relevant sources and permitted project observations. Replace only established unknowns with dated supported facts. Otherwise change the route or retain classroom-concept status. No real route tested, pupil result measured or sharing permission claimed.