Review participants, spectators, other users, nearby events and shared facilities together. Includes a filled constraints table, a checked fictional headcount and an editable evidence record.
On this page
Count the affected uses rather than just bookings
A Scottish outdoor walking event fits a location only when its actual use of the place can work alongside land management, other outdoor users, local residents and the environment. Start with who and what will be there, when they overlap and which areas they use. A registration total or leader-to-walker ratio does not establish the capacity of a shared site.
The National Access Forum’s event guidance asks organisers to consider the location, timing and scale of an event together. It discusses spectators, neighbouring events, local facilities, seasonal operations and environmental effects. These are broader than the number of people an organiser can check in.
List participants, helpers, spectators, transport arrivals and other anticipated use. Keep different estimates separate. A person who walks and then helps at the finish is one person occupying different places at different times; counting both roles as separate people would distort the record.
Fictional estimate: a draft has 36 participants, 12 separate helpers and an estimated 24 spectators: 36 + 12 + 24 = 72 people associated with the event. The assumptions explicitly make the groups distinct. This is neither a measured peak nor a safe capacity, and it omits unrelated visitors and another event. The spectator estimate remains uncertain.
Check location and season with the relevant people
Break the event footprint into useful places: arrival and parking, briefing, route bottlenecks, service points, spectator areas and the finish. Record when each is used and which other activity might overlap. A spacious walking section cannot compensate for an unresolved narrow arrival point.
Discuss the actual date with relevant land managers and, where appropriate, the access authority, local community and conservation bodies. Ask about land operations, other planned events, sensitive features and local facilities. The guidance identifies issues such as lambing, nesting birds and seasonal field sports as reasons for early discussion; it does not provide a national calendar that settles every place.
Sources: [1]
Keep recent observations separate from future arrangements. A weekday recce shows that visit’s condition and use. It does not count weekend spectators, confirm event-time toilet opening or rule out another event using the same parking. Obtain the relevant dated information and name unresolved questions.
Environmental effects may become worse in wet conditions. Discuss that possibility while routes and timing can change, rather than basing a proposal only on the most favourable visit. This is an evidence and liaison task; the website has not inspected the site or calculated an acceptable flow or environmental load.
Build a six-part shared-site constraints record
Use one record that connects each concern to its evidence, affected people and possible change. The entries below are wholly fictional; their open questions are deliberately not answered by a numerical score.
On a small screen, swipe inside this table. Keyboard users can focus it and use the arrow keys.
| Part of the plan | What is known in the example | Question still to resolve | Possible change to discuss |
|---|---|---|---|
| Arrival and parking | A proposed parking area is named, but its use is not agreed. | Can that area serve the actual arrival pattern without displacing other needs? | Confirm another suitable arrival arrangement or change the event footprint. |
| Briefing point | The draft gathers event participants, helpers and spectators at one entrance. | Does it fit alongside ordinary visitors and the actual entrance use? | Discuss a different suitable place or staggered arrangements; do not infer a safe size. |
| Narrow route section | A past recce identified a shared narrow path. | How will event timing and other users interact there? | Change route or timing where an appropriate shared-use plan can be established. |
| Seasonal land activity | The manager has raised a date-specific working-area concern. | Which part of the proposal interferes and what alternative can be considered? | Alter the route, date or affected area in discussion with the manager. |
| Environment and conditions | A sensitive area and wet-weather effects are still being discussed. | What measures or specialist advice are needed for this actual footprint? | Avoid the affected area or change the event; keep conservation questions separate. |
| Local services and other events | A toilet listing exists; another event may use nearby facilities. | Are facilities and combined demand workable at the proposed times? | Coordinate with the relevant operators and organisers, or choose a different arrangement. |
Give each unanswered question an owner and an actual next step. “Capacity checked” is too broad when parking remains proposed or the wet-weather effect has not been considered. Use the land-manager permission guide for facilities and effects that need a separate decision.
Work through a fictional event with unresolved pressures
In the fictional 72-person draft, organisers initially look only at the 36 walking places. The finish is beside a popular path, the spectators are not included in the first facilities discussion, and another event may use the same arrival area. Nobody has yet checked the combined timing with the responsible parties.
The organiser changes the record before confirming places: event-associated estimate 72 under stated assumptions; spectator number uncertain; unrelated users uncounted; other-event overlap awaiting discussion. That does not prove the plan is unsuitable, but it shows why “only 36 walkers” cannot settle it.
Suppose a later discussion identifies an alternative finish away from the path. Moving the finish is a proposal until its access, facilities, permission and return arrangement are established. The change also affects signs, transport messages and the people staffing each area. Removing one bottleneck from the sketch does not complete the event plan.
If the relevant parties cannot establish a workable arrangement, revise location, date, format or numbers, or do not proceed with that proposal. Reducing registrations can be one change to consider; it is not a calculation that certifies the resulting site capacity. Do not preserve a published headcount by shifting an unresolved pressure onto residents or other visitors.
Turn constraints into changed timing or arrangements
Make each agreed change specific: the area covered, period of use, person responsible, arrangement with other users and evidence still needed. Where an event needs signs, facilities or restrictions, establish the relevant permission or authority process before using them. A volunteer’s presence does not create traffic-control authority or extra physical space.
The guidance encourages cooperation where several events affect the same area, suitable travel choices and a short environmental policy. Write concrete actions rather than a general “leave no impact” promise. An original policy draft could identify the areas to avoid, the event-material removal owner, the route for reporting damage and the review when conditions change. It must describe arrangements the organiser can actually carry out.
Sources: [1]
Update the participant and helper information after the plan changes. A transport suggestion is not a confirmed service, and a new arrival area is not usable merely because it appears in the record. Keep those dependencies visible through the whole-route recce and actual provider checks.
Download the original shared-site constraint record (TXT). It helps join facts, uncertainty and actions; it does not calculate a safe crowd density, environmental threshold or approved event capacity.
Check three capacity assumptions
These fictional checks distinguish estimates, observations and an established arrangement.
Case 1
The example has 36 participants, 12 separate helpers and an estimated 24 spectators. What event-associated planning estimate results?
Show answer and explanation for case 1
72 people under those stated assumptions.
Add the three distinct groups. This is not a measured simultaneous peak, excludes unrelated users and does not establish a safe capacity; the spectator estimate is uncertain.
Case 2
A quiet weekday recce found no queue at a toilet. Does that confirm a weekend event’s facility arrangement?
Show answer and explanation for case 2
No. Check the actual event-time operation and combined use.
The observation has a place and date. Spectators, other visitors, opening hours and nearby events may change the relevant question.
Case 3
A shared narrow path is unresolved. Does appointing more marshals prove it can accommodate the event?
Show answer and explanation for case 3
No. Establish an appropriate shared-use arrangement or change the proposal.
Helpers can perform agreed tasks but do not create space, eliminate environmental effects or grant access and traffic-control authority.
Sources and further reading
- Outdoor events in Scotland: guidance for organisers and land managers (updated June 2017)National Access Forum guidance published by Scottish Natural Heritage, now NatureScot. Event liaison, permission thresholds, shared-location impacts and restoration; its rough planning table excludes club-member outings. Old organisational names and web addresses should be checked through current services.
- Scottish Outdoor Access Code: Outdoor events (updated 23 June 2026)Current official page explains event access limitations and directs organisers to the 2017 guidance and the 3 March 2026 legal opinion. It is not a decision about the event described here.